1
|
Lucknow Metro Phase 1B project which will connect Charbagh Railway Station and Vasant Kunj with 12 stations.
|
U.P. METRO RAIL CORPORATION LTD.
|
2
|
ROAD OVER BRIDGE / SUBWAY/ LOW CAST ROB FOR ELEMINATION OF LEVEL CROSSING IN SAMASTIPUR, BIHAR.
|
M/s RITES LTD.
|
3
|
Carrying Out Soil Investigation work in connection with Hazaribagh-Arigada doubling with "Y" connection with Ranchi Road, Shivpur-Kathautia Doubling and Koderma-Hazaribagh doubling with "Y" connection at Koderma-Hazaribagh Town under jurisdiction of East Central Railway.
|
Delhi Integrated Multi-Modal Transit System (DIMTS)
|
4
|
Geotechnical Investigation for Design of Embankment/Structure Locations East Central Railway Project New Paharpur to New Kastha in the state of Bihar.
|
Larsen & Toubro Limited.
|
5
|
Geotechnical Investigation at Sarita Vihar Metro Depot, Faridabad Delhi.
|
Afcons Infrastructure Limited.
|
6
|
Geotechnical Investigation work at DRDO BSL-4 (MMCC), Gwalior, Madhya Pradesh (Ken – Betwa Project)
|
NCC Limited.
|
7
|
Nano Urea Manufacturing Plant at Hindustan Urvarak & Rasayan Limited (HURL) Gorakhpur.
|
S3M Design Consultants LLP
|
8
|
Soil Investigation and Topographical Survey for unit#5 & 6, 2X660 MW, Power Station, Stage-III, Odisha. (Odisha Powe Generation Corporation Limited).
|
Bharat Heavy Electricals Limited (BHEL)
|
9
|
GEOTECHNICAL INVESTIGATION FOR RAILWAY THIRD LINE, GIROHI TO CHUNAR LINE.
|
GIRRAJJI STONE CRUSHERS PVT LTD
|
10
|
Geotech Investigation for proposed construction of 1x660 MW Satpura Project at Sarani (Madhya Pradesh).
|
Bharat Heavy Electricals Limited (BHEL)
|
11
|
Pune to Chhatrapati Sambhaji Nagar Expressway (Km. Ch. 100+000 to Ch. 200+000) and Tunnel from 150+300 to ch. 152+530
|
MSV International, Inc.
|
12
|
Phase II of Kochi Metro Rail Project from JLN Stadium to Infopark via Kakkanad.
|
M/s AFCONS INFRASTRUCTURE LTD.
|
13
|
Four laning of Dhanehri-Lailapur/ Vairengte section (pkg-2) from existing chainge km 12+920 to km 43+00 of NH 306 (design Chainge km 20+00 to km 49+360) on Silchar - Vairengte - Sairang road in the state of Assam.
|
M/s. Jandu Construction India Pvt. Ltd.
|
14
|
Construction of New BG Railway Line Project from Murkongselek station in the state of Assam (Ch: 0.780 Km) to proposed Pasighat station in the state of Arunachal Pradesh (Ch: 27.062 Km) including Electrical (General), Signal and Telecommunication works.
|
M/s TTC Infra India
|
15
|
ECONOMIC CORRIDORS, INTER CORRIDORS, FEEDER ROUTES AND COASTAL ROADS TO IMPROVE EFFICIENCY OF FREIGHT MOVEMENT IN INDIA (AGRA – GWALIOR NH-44 GREENFIELD ACCESS CONTROLLED HIGHWAY).
|
M/s LEA Associates South Asia Pvt. Ltd
|
16
|
RE DEVELOPMENT OF KASHI RAILWAY STATION, VARANASI
|
M/s G. S. Express Private Limited
|