| 1 | Bilaspur
				– Urga section of NH-130A from design Ch. 0+000 to Ch. 72+200,
				(From NH-49 near Dekha village to Bhaisma village) in the state
				of Chhattisgarh | G.R.
				Infra project Limited | 
		
		
		
		
		
		
		
		
		
		
			| 2 | Four
				Laning of Imphal-Moreh Section of NH 39 From Km. 330+000 To
				350+000 in The State of Manipur (Package-1) | G.R.
				Infra project Limited | 
		
		
		
		
		
		
		
		
		
		
			| 3 | Redesigning,
				Rehabilitation and Upgradation to Four Lane Configuration &
				Strengthening of UP Haryana Border to Rohna Section from Km 0.00
				to Km 44.80 (Design Chainage) (Length 44.80 km) of NH-334B in the
				State of Haryana on Hybrid Annuity Mode Under NH (0) (Package -1) | Gawar
				Construction Limited | 
		
		
		
		
		
		
		
		
		
		
			| 4 | Eight
				Lane Access Controlled Expressway from Bani village to Bardawadi
				village of Mandsaur district (Ch. 517+420 to 546+920; Design Ch.
				65+000 to Ch. 94+500) section of Delhi-Vadodara Greenfield
				Alignment (NH-148N)
				on
				EPC Mode under Bharatmala Pariyojana in the State of Madhya
				Pradesh.-Package No. 19 | MKC
				Infrastructure Ltd. | 
		
		
		
		
		
		
		
		
		
		
			| 5 | 6
				Lane Kaithal to Mahendragarh in The State of Haryana | Accrete
				Consulting Engineers(P) Ltd. | 
		
		
		
		
		
		
		
		
		
		
			| 6 | Development
				of Economic Corridor, Inter Corridor and Feeder Routes Improve
				The Efficiency of Fright Movement in India Under Bharatmala
				Pariyojna Package-6, in the State Of Haryana. | G-Engineering
				Advisory Services Pvt. Ltd. | 
		
		
		
		
		
		
		
		
		
		
			| 7 | Alignment
				Axis of Proposed Ayodhya Barrage at 1000 M U/S Sarju Bridge
				across Saryu River at Ayodhya. | The
				Executive Engineer,
				
				Office
				of the Executive Engineer,
				
				Investigation
				And Planning Division,
				Gonda | 
		
		
		
		
		
		
		
		
		
		
			| 8 | Construction
				of 4 Laning of Aligarh-Kanpur Section (Pkg-4 from Naviganj -
				Mitrasen) of NH-91 in the state of Uttar Pradesh on Hybrid
				Annuity Mode Under Bharatmala Pariyojna | G.R.
				Infra project Limited | 
		
		
		
		
		
		
		
		
		
		
			| 9 | DPR
				Consultancy Services for 22 Nos of Standalone Bridges (Section 1
				- 11 Nos. of Bridges) in the State of Bihar | Lea
				Associates South Asia pvt ltd | 
		
		
		
		
		
		
		
		
		
		
			| 10 | Geotechnical
				Investigation Work of Kanpur Lucknow Expressway | EGIS
				India Consulting Engineers Private Limited | 
		
		
		
		
		
		
		
		
		
		
			| 11 | Geotechnical
				Investigation works at Super Thermal Power Plant at Buxar, Bihar | M/s
				Geo Dynamics | 
		
		
		
		
		
		
		
		
		
		
			| 12 | Construction
				and Development of 4/6 Lane DIvided Carriageway for THDCIL Bypass
				for Re-routing of Ghaziabad-Aligarh (NH-91) Road Project in
				THDCIL Area from km 98+400/0+000 (Existing/Design Chainage) near
				Dushehra Village to km 105+500/09+285 (Existing/Design chainage)
				Near Arnia Khurd Village total length of Bypass= 09.285 kms on
				EPC mode under NHDP Phase-IV in the State of Uttar Pradesh | Accrete
				Consulting Engineers(P) Ltd. | 
		
		
		
		
		
		
		
		
		
		
			| 13 | Geotechnical
				Survey work for proposed SH-30 & 88, SH-65,SH-100,SH-49 Roads | EGIS
				India Consulting Engineers Private Limited |