Projects

S/N Name of Project Client
1 Bilaspur – Urga section of NH-130A from design Ch. 0+000 to Ch. 72+200, (From NH-49 near Dekha village to Bhaisma village) in the state of Chhattisgarh G.R. Infra project Limited
2 Four Laning of Imphal-Moreh Section of NH 39 From Km. 330+000 To 350+000 in The State of Manipur (Package-1) G.R. Infra project Limited
3 Redesigning, Rehabilitation and Upgradation to Four Lane Configuration & Strengthening of UP Haryana Border to Rohna Section from Km 0.00 to Km 44.80 (Design Chainage) (Length 44.80 km) of NH-334B in the State of Haryana on Hybrid Annuity Mode Under NH (0) (Package -1) Gawar Construction Limited
4 Eight Lane Access Controlled Expressway from Bani village to Bardawadi village of Mandsaur district (Ch. 517+420 to 546+920; Design Ch. 65+000 to Ch. 94+500) section of Delhi-Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh.-Package No. 19 MKC Infrastructure Ltd.
5 6 Lane Kaithal to Mahendragarh in The State of Haryana Accrete Consulting Engineers(P) Ltd.
6 Development of Economic Corridor, Inter Corridor and Feeder Routes Improve The Efficiency of Fright Movement in India Under Bharatmala Pariyojna Package-6, in the State Of Haryana. G-Engineering Advisory Services Pvt. Ltd.
7 Alignment Axis of Proposed Ayodhya Barrage at 1000 M U/S Sarju Bridge across Saryu River at Ayodhya. The Executive Engineer, Office of the Executive Engineer, Investigation And Planning Division, Gonda
8 Construction of 4 Laning of Aligarh-Kanpur Section (Pkg-4 from Naviganj - Mitrasen) of NH-91 in the state of Uttar Pradesh on Hybrid Annuity Mode Under Bharatmala Pariyojna G.R. Infra project Limited
9 DPR Consultancy Services for 22 Nos of Standalone Bridges (Section 1 - 11 Nos. of Bridges) in the State of Bihar Lea Associates South Asia pvt ltd
10 Geotechnical Investigation Work of Kanpur Lucknow Expressway EGIS India Consulting Engineers Private Limited
11 Geotechnical Investigation works at Super Thermal Power Plant at Buxar, Bihar M/s Geo Dynamics
12 Construction and Development of 4/6 Lane DIvided Carriageway for THDCIL Bypass for Re-routing of Ghaziabad-Aligarh (NH-91) Road Project in THDCIL Area from km 98+400/0+000 (Existing/Design Chainage) near Dushehra Village to km 105+500/09+285 (Existing/Design chainage) Near Arnia Khurd Village total length of Bypass= 09.285 kms on EPC mode under NHDP Phase-IV in the State of Uttar Pradesh Accrete Consulting Engineers(P) Ltd.
13 Geotechnical Survey work for proposed SH-30 & 88, SH-65,SH-100,SH-49 Roads EGIS India Consulting Engineers Private Limited