1
|
Bilaspur
– Urga section of NH-130A from design Ch. 0+000 to Ch. 72+200,
(From NH-49 near Dekha village to Bhaisma village) in the state
of Chhattisgarh
|
G.R.
Infra project Limited
|
2
|
Four
Laning of Imphal-Moreh Section of NH 39 From Km. 330+000 To
350+000 in The State of Manipur (Package-1)
|
G.R.
Infra project Limited
|
3
|
Redesigning,
Rehabilitation and Upgradation to Four Lane Configuration &
Strengthening of UP Haryana Border to Rohna Section from Km 0.00
to Km 44.80 (Design Chainage) (Length 44.80 km) of NH-334B in the
State of Haryana on Hybrid Annuity Mode Under NH (0) (Package -1)
|
Gawar
Construction Limited
|
4
|
Eight
Lane Access Controlled Expressway from Bani village to Bardawadi
village of Mandsaur district (Ch. 517+420 to 546+920; Design Ch.
65+000 to Ch. 94+500) section of Delhi-Vadodara Greenfield
Alignment (NH-148N)
on
EPC Mode under Bharatmala Pariyojana in the State of Madhya
Pradesh.-Package No. 19
|
MKC
Infrastructure Ltd.
|
5
|
6
Lane Kaithal to Mahendragarh in The State of Haryana
|
Accrete
Consulting Engineers(P) Ltd.
|
6
|
Development
of Economic Corridor, Inter Corridor and Feeder Routes Improve
The Efficiency of Fright Movement in India Under Bharatmala
Pariyojna Package-6, in the State Of Haryana.
|
G-Engineering
Advisory Services Pvt. Ltd.
|
7
|
Alignment
Axis of Proposed Ayodhya Barrage at 1000 M U/S Sarju Bridge
across Saryu River at Ayodhya.
|
The
Executive Engineer,
Office
of the Executive Engineer,
Investigation
And Planning Division,
Gonda
|
8
|
Construction
of 4 Laning of Aligarh-Kanpur Section (Pkg-4 from Naviganj -
Mitrasen) of NH-91 in the state of Uttar Pradesh on Hybrid
Annuity Mode Under Bharatmala Pariyojna
|
G.R.
Infra project Limited
|
9
|
DPR
Consultancy Services for 22 Nos of Standalone Bridges (Section 1
- 11 Nos. of Bridges) in the State of Bihar
|
Lea
Associates South Asia pvt ltd
|
10
|
Geotechnical
Investigation Work of Kanpur Lucknow Expressway
|
EGIS
India Consulting Engineers Private Limited
|
11
|
Geotechnical
Investigation works at Super Thermal Power Plant at Buxar, Bihar
|
M/s
Geo Dynamics
|
12
|
Construction
and Development of 4/6 Lane DIvided Carriageway for THDCIL Bypass
for Re-routing of Ghaziabad-Aligarh (NH-91) Road Project in
THDCIL Area from km 98+400/0+000 (Existing/Design Chainage) near
Dushehra Village to km 105+500/09+285 (Existing/Design chainage)
Near Arnia Khurd Village total length of Bypass= 09.285 kms on
EPC mode under NHDP Phase-IV in the State of Uttar Pradesh
|
Accrete
Consulting Engineers(P) Ltd.
|
13
|
Geotechnical
Survey work for proposed SH-30 & 88, SH-65,SH-100,SH-49 Roads
|
EGIS
India Consulting Engineers Private Limited
|