1
|
RUB/Limitted
height Subway at level Crossing no. 134 between Adhinpur -
Chaubisi of Zafrabad to Utratia of Lucknow Division
|
Northern
Railway, Lucknow
|
2
|
Civil
and Track works for Double Line Railway Involving Formation in
Embankment/ Cutting. Ballast on Formation Track Works Bridges,
Structure Building, Yards, Integration with IR Existing Railway
System and Testing & Commissioning on Design Build Lump Sum
Basis for Mugan Sarai to New Karehane Station of Freight Corridor
Project- Geotechnical Exploration and quarry Core drilling at
Hanumana Crusher
|
GMR
Infrastructure Limited
|
3
|
Different
Chainages under Strengthening & Widening Project of
Tanda-Varanasi road (NH-233)
|
Dilip
Buildcom Limited
|
4
|
OHE
Foundation at Defrent changes of Zafarabad-Akbarpur-Tanda Line
with Traction Sub-Station at shahganj.
|
Zapdor
Engineering Pvt.Ltd.
|
5
|
Electrical
Locomotive Factory & Township at Madhepur in Bihar
|
Larsen
& Turbo Pvt Ltd
|
6
|
Elevated
Viaduct, 8 Elevated Stations Vill- Transport Nagar, Krishna Nagar
Singar Nagar Alambagh, Alambagh Bus Station,Mawaiya, Durgapuri
and Charbagh Railway Station from chainage 68.7m to 9171.440m and
Connecting Elevated Viaduct and Ramp Depot at P & C Ground
Transport Nagar on North South Corridor of LMRC. Lucknow
|
Lucknow
Metro Project
L&T
Construction / Heavy Civil Infrastructure IC
|
7
|
NH-56
4-Lane Bypass connecting NH-56 at Km 174+400 and terminating near
Behta Village Road (Bypass ch. from Km 0.000 to Km 32.000/31.489
average length 31.745 km) at The state of Uttar Pradesh under
NHDP Phase-VIII
|
Jaiprakash
Associates Limited
|
8
|
Multimodal
TWT Terminal at Varanasi
|
M/s
Afcons ISnfrastructure Ltd.
|
9
|
Ram
Manohar Lohia Rajya Prashikshan Evam Prabandhan Academy at D-14,
C.G City, Sultanpur Road, Lucknow
|
J.
Kumar Infraprojects Ltd.
|
10
|
Doubling
of Rail track at Roza to Sitapur Railway line.
|
Northern
Railway
|
11
|
Bridges
Under Allied works on Alam Nagar- Utrahtia Bypass line in
Connection with Alamnagar-
Utrahtia doubling
of Lucknow Division of Northern Railway.
|
Emerging
Infrastructure, Pvt. Ltd.
|
12
|
400
kV/D/c Transmission line on Monopols from 400 Kv Sub-station at
Noida, Sector-148 to 400kV Sub-Station at Sector-123 Noida
|
Bajaj
Electricals Limited
|
13
|
Different
Bridges for Eastern Dedicated Freight Corridor Project in the
State of Uttar Pradesh
|
GMR
Infrastructure Limited
|
14
|
K.D.
Singh Babu Stadium - Munshi Puliya Section of North-South
Corridor of Lucknow Metro Project
|
Lucknow
Metro Project
L&T
Construction / Heavy Civil Infrastructure IC
|