1
|
Jhansi-Bhimsen
Doubling Project of Rail Vikas Nigam Limited
|
KEC
International Limited,
|
2
|
Staff
Colony of LMRC at The Campus of Dr. Sampurnanad Prison Training
Institute Near ikshapuri Crossing, VIP Road, Lucknow
|
Lucknow
Metro Rail Corporation Limited
|
3
|
PAC
Campus For 32, Pac Battalion At Transport Nagar Road, Lucknow
|
Lucknow
Metro Rail Corporation Limited
|
4
|
Rail
Over Bridge, Vehicular Under Pass, Minor Bridge, Major Bridge For
Munger-Mirzachauki 4 Lane Green Field Project In The State Of
Bihar
|
M/S
SAI Consulting Engineers Pvt. Ltd.
|
5
|
Balanced
Cantilever Span Approx. 255.00 M (Central Span Of 105.00 M And
End Span of Each Of 75.00 M Approx.) At Mawaiya Railway Crossing
on North-South Corridor For Lucknow Metro At Lucknow
|
S.P.
Singla Construction Private Limited Lucknow
|
6
|
Elevated
Viaduct, 8 Elevated Stations Viz. Transport Nagar, Krishna Nagar,
Singar Nagar, Alambagh, Alambagh Bus Station, Mawaiya, Durgapuri
And Charbagh Railway Station From Chainage 687.140 M To 9171.440
M And Connecting Elevated Viaduct & Ramp To Depot At Pac
Ground Transport Nagar On North - South Corridor Of Lucknow Metro
At Lucknow, Uttar Pradesh
|
Larsen
& Turbo Pvt.Ltd.
|
7
|
JSWMI
Steel Service Centre Pvt. Ltd. at Baghola In District Palwal,
Haryana
|
RCC
Eco Build Systems Ltd.
|
8
|
Amrapali
Yojna, Hardoi Road, Lucknow
|
Shapoorji
Pallonji And Company Pvt
|
9
|
220/132
Kv.-2-100 MVA Sub-Station at Bansi in District Siddharth Nagar
|
Techno
Fab Engineering Limited
|
10
|
Enclave
Residential Apartment at Kursi Road in District Lucknow
|
NCC
Limited, NCC House, Madhapur
|