1
|
Six
Laning of Gurgaon - Kotputli - Jaipur Section of Section of NH-8
from Km 42.700 to Km 273.000 (length 225.600 Km) in the State of
Haryana and Rajasthan to be executed as BOT (Toll) on DBFO
pattern under NHDP Phase-V
|
Aarvee
Associates, Architects Engineers & Consultants Pvt. Ltd.,
Hyderabad
|
2
|
Lakhimpur
Sisiyer Road in the State U.P
|
Accrete
Consulting Engineering Private Limited
|
3
|
Different
Bridge for Eastern Dedicated Freight Corridor Project in the
State of Uttar Pradesh
|
GMR
Infrastructure Limited
|
4
|
Burhwal-Sitapur
Doubling Project
|
North-Eastern
Railway, Lucknow
|
5
|
Jaunpur
to Tanda Northern Railway in Connection With Doubling of Railway
Track
|
Anurag
Project Management Consultants Pvt. Ltd.
|
6
|
Rail
Based Mass Transit System at Shayama Devi Balika School for Metro
Depot on Corridor 1 (Shyam Nagar to Sooha Bazar) Gorakhpur
|
RITES
Limited
|
7
|
Techno
Economic Services and DPR for Mass Rapid Transit System in
Allahabad
|
RITES
Limited
|
8
|
Upgradation
of the Stretch Giddalur-Cumbum-Thakapalli-Vindukonda.
Narasaraopet & Terminatin at it & Junction with NH-16 at
Guntur of NH-544D in the State of Andhra Pradesh
|
STUP
consultants Pvt Ltd
|
9
|
Bridges
in Connection with Gauge Conversion of Pilibhit Shahjahanpur
Section North-Eastern Railway, Luknow
|
RVNL
|
10
|
NH
Connectivity to Backward areas/Religiousr tourist places (BRT)
From Chitrakoot (NH-35) to Rajapur to Manjhanpur to Palhana
(NH-19) [Section Design Chainage I.e. 0+060 Km to 73+650 Km]"
& Part of Satna to Kotar to Semaria to Sirmaur 10 Jawa on
NH-35 near Shankargarh [Section: Design Chainage I.e. 100+000 Km
to 125+440 Km]
|
Lea
Associates South Asia P. Ltd.
|
11
|
25
kV, 50 Hz, single phase, AC electrification including OHE and TSS
Works as Composite Electrical Work in Surandra Nagar(Excl.)
Pipvav (incl.) Group-223 in Bhavnagar Divi. of Western Railway
under RE project Ahmedabad
|
Kalpataru
Power Transmission Limited
|
12
|
Four/Six
Laning of Aurangabad (km 290.200) to Karodi (km 320.104) Road
Section of NH-211(new NH No. 52) (existing length 29.904 km
design length 30.215 km) in the State of Maharashtra under NHDP
Phase IV – B on EPC mode
|
Larsen