1
|
Malanpur
Crusher Plant
|
APCO
Infratech Pvt. Ltd.
|
2
|
Jaunpur
to Akbarpur, Northern Railway in Connection with Doubling of
Railway Track
|
K
& J Projects Private Limited
|
3
|
Bridge
No. 76, Between Jaunpur To Jafarabad, Northern Railway In
Connection With Doubling Of Railway Track
|
GAWAR
Construction Limited
|
4
|
Major/Minor
Bridges/Robs/Rubs for Katghora – Dongargarh Project (Reach-3
From Km 150.000 To Km 258.000 Including Spur Lines) Under
Jurisdiction of Chhattisgarh Railway Corporation Limited in the
State Of Chhattisgarh.
|
Chhattisgarh
Railway Corporation Ltd.
|
5
|
Eight
Lane Expressway starting Before KMP Expressway and ends at Ch.
7+000 near Khanpur Ghati (Km 18+500 to Km 47+000) section of
Delhi - Vadodara Green field Alignment (NH-148N) on EPC Mode
under Bharatmala Pariyojana in the State of Haryana (Package II)
|
APCO
Infratech Pvt. Ltd.
|
6
|
Four
Laning of Dwarka (Kuranga) - Khambhaliya - Devariya Section from
Km 203+500 to 176+500 and from Km 171+800 to 130+000 (Design
Length 66.890 Km) of SH 25 in The State of Gujarat Under
Bharatmala Project on Hybrid Annuity Mode (Package- 1)
|
G.R.
Infra project Limited
|
7
|
Purvanchal
Expressway Package-III from Jaraikala (Dist. Amethi) to Sidhi
Ganeshpur (Dist. Sultanpur)
|
B&S
Engineering Consultants Pvt. Ltd
|
8
|
Pavement
And Material Investigation for Project Development Consultancy
for Development of Bundelkhand Expressway Consultancy in the
State Of Uttar Pradesh
|
EGIS
India Consulting Engineers Private Limited,
|
9
|
Structure/Briedges
Eight Lane Divided Carriageway Starting at Ch. 47+000 near
Khanpur Ghati to Haryana-Rajasthan Border (Ch. 47+000 to 78+800)
Section of Delhi – Vadodara Greenfield Alignment (NH-148N)
|
Accrete
Consulting Engineers(P) Ltd.
|
10
|
Development
of Bundelkhand Expressway Project (Package-I): From Gonda (Dist.
Chitrakoot) to Mahokhar (Dist.Banda (Km (-) 0+790 to Km 49+700)
in the state of Uttar Pradesh
|
APCO
Infratech Pvt. Ltd.
|